Painted-brick breezeway opens onto a garden with white hydrangeas, a Japanese maple, and a clipped hedge.

What’s Changing Along the Wilson Bridge Road Trail

August 20, 2026

If you live off Wilson Bridge Road in Worthington, you already know the quarter mile of paved trail that runs from Olentangy Parklands, cuts along the road, then drops into sharrows behind the Shops at Worthington Place before it lets out onto High Street. It's the route most people in this pocket of the city use without thinking about it: dog walk before work, ride down to the Saturday market, cut-through on the way to Selby Park. That stretch of pavement has been there since 2014, and for most of the past decade nothing about it has changed.

Something is about to change around it, though, and the version of the story that's been circulating since spring doesn't quite match what actually landed in front of the city in July.

What Got Presented in April

In April, Worthington Pulse reported that Crawford Hoying, the same developer behind Bridge Park in Dublin, held a community meeting to walk residents through an early concept for the three aging office buildings that sit at 400, 450, and 500 West Wilson Bridge Road. The pitch at that meeting was modest by Bridge Park standards. Russell Hunter, the company's Executive Vice President of Development, described a roughly 20-acre site holding about 400 residential units, 100,000 square feet of retail, 150,000 square feet of office space, and two hotels. He compared it directly to Bridge Park, which sits on 25 acres and carries 750 units and 550,000 square feet of office. By that comparison, the April concept was smaller across nearly every category, particularly office space, which came in at roughly a quarter of Bridge Park's total.

The design language matched that restraint. Materials were described as masonry, brick, glass, and steel, similar to Bridge Park, but the architecture team framed the look as something distinct from a straight copy. As Worthington Pulse reported, the architecture team called it "21st-century Worthington," meant to sit alongside the existing character of the corridor rather than replace it.

The traffic conversation at that same meeting is worth remembering, because it turned out to matter more than the buildings. As Worthington Pulse reported, Hunter told the room that the site's biggest obstacle wasn't design or financing. It was "the thing that is completely outside of our control... it's westbound traffic along West Wilson Bridge Road," specifically the backup at the Olentangy River Road intersection just west of the property. His ask to the city was a turn lane at that intersection, something Crawford Hoying can advocate for but cannot build on its own.

What Actually Reached the Rezoning Table in July

Three months later, the formal filing looked different.

The Preliminary Development Plan that went to Worthington's Municipal Planning Commission on July 9 covers 17.6 acres, smaller than the 20 acres discussed in April, and the residential program grew substantially:

  • 250 multifamily units
  • 8 townhome units
  • 182 condominium units
  • 150 senior living units
  • 290 hotel keys
  • 211,000 square feet of office space
  • 134,600 square feet of retail and food and beverage space
  • 2,381 parking spaces

Add the residential categories together and the total comes to 590 units, roughly 190 more than the figure presented at the April community meeting, on a footprint that shrank rather than grew. The office number also moved, up from the roughly 150,000 square feet discussed in the spring to 211,000 square feet in the formal application, and retail grew too, from 100,000 square feet in the spring concept to 134,600 square feet in the filing. The senior living component, 150 units, wasn't a headline item in the April framing at all.

None of this means the plan turned into a carbon copy of Bridge Park. Office space still trails what Bridge Park carries by a wide margin. But it does mean the "smaller, gentler version of Bridge Park" read that circulated after the April meeting was describing an earlier draft. The version now in front of the city is heavier on housing, heavier on senior living, and denser per acre than what residents heard about first.

The rezoning is targeted for completion by November 2026. Construction, if the process holds to that timeline, wouldn't start before 2028.

The Intersection Still Hasn't Been Answered

Here's the part that actually affects your daily walk more than any unit count. The traffic concern Hunter raised in April, the westbound backup at Olentangy River Road and West Wilson Bridge Road, doesn't appear to have been resolved between the community meeting and the July filing. It was the single most active topic at the April session, and it's the kind of problem that belongs to the city, not the developer, since a turn lane at that intersection would require public infrastructure work outside the project boundary.

Worthington's own 2026-2028 policy agenda, adopted by City Council in April, lists a pedestrian and bicycle crossing at "Wilson Bridge & High" as an active infrastructure item, not a completed one. That's a reminder that the broader vision for connecting this corridor by foot and bike, first outlined when Phase 1 of the Wilson Bridge Multi-Use Trail opened in 2014, still has open pieces. The idea of extending the trail further toward the Community Center, and eventually bridging Route 23, was already on the table when Phase 1 opened in 2014. It still hasn't been checked off.

So the honest answer for anyone who uses that trail regularly is that the buildings are years away and the traffic question that will actually determine how it feels to bike or walk this stretch is still unresolved on paper.

What Doesn't Change in the Meantime

Selby Park stays the anchor of Colonial Hills either way, still the spot for the neighborhood's Fourth of July gathering and still the place with the shelter house, tot lot, and grassy field that make it the default meeting point for anyone north of High Street. The Saturday routine down to the Worthington Farmers Market isn't going anywhere soon either. Founded in 1987 and still drawing close to 100 vendors every Saturday morning from May through October, it's one of the more consistently ranked farmers markets in the country, and the walk or ride down Wilson Bridge Road to get there will look the same next spring as it did last spring.

What's worth actually watching, if you're the kind of resident who pays attention to this corridor, isn't the rendering of the new buildings. It's whether the city and the developer settle the Olentangy River Road turn lane question before construction, and whether the plan that clears rezoning in November looks anything like the 590-unit version filed in July or shifts again before ground breaks. Either way, you've got at least two more full farmers market seasons before any of it shows up on your ride.

If you're weighing what a corridor like this means for property values or timing a move in or out of the Brookside and Colonial Hills area, that's a different conversation, and one worth having with someone who tracks these filings as they happen. Oliver Chapman follows Worthington's development pipeline alongside the neighborhoods it touches. Let's Connect when you're ready to talk through what it actually means for your address.

A Relationship-Driven Approach

Oliver Chapman is committed to building lasting relationships through honest communication, local expertise, and personalized service tailored to every client. From first-time buyers to experienced investors, clients receive dedicated support designed to simplify every step of the real estate process. Contact Oliver today to discuss all your real estate needs!